基坑降水對砂性地基板樁碼頭的影響(一)
基坑降水對砂性地基板樁碼頭的影響
馬永平 黃海云
(中船第九設計研究院工程有限公司)
摘 要:在砂性場地中建造船塢時,船塢基玩降水施工對臨近的板椎碼頭的值移有較大的影響,甚至會出!酸被墻的拉移向岸側移動的現象。結合新加波某新建船廠工程,對船璃基流降水施工進程中板推住移的際監測成果進行分析與研究,并應用 PLAXIS 有限元程序進行數值模擬分析。其計算結來進一步驗證了監測結果位移趨勢的正確性。
關鍵詞:稻雞 板樹碼頭 降水 位移
The impact on sheet-pile wharf in sandy foundation due to foundation pit dewatering
MA Yong-ping HUANG Hai-yun
(China Shipbuilding NDRI Engineering Co.,Lid.,)
Abstract:During dry dock construction in sandy site,the dewatering of dock foundation pit affects the displacemen of sheet-pile wharf nearby. It can even appear the phenomenon that the sheet pile wall moves to the shore side. Based on a new shipyard project in Singaporethis paper presents the analysis and rescarch for the results of the sheet pile wall displacement monitoring during the dewatering work, and also presents numerical simulation by the application of finite element program PLAXIS.The result of numerical simulation further verified the correctness of the results of displacement monitoring.
Key words: Dry dock, sheet-pile wharf, dewatering, displacement
在通常情況下,拉錨式板樁碼頭在墻前開挖過程及開挖完成后,板樁墻的位移值應該是向水域方向移動的,根據經驗一般在拉錨點以下開挖面以上出現向水域方向的位移最大值。但是,在純砂性地基且板樁墻后附近有大面積降水的情況下,位移值就會明顯減小,甚至位移不向水城發展,反而向陸域方向發展。這主要是由于板樁墻后的降水及砂的強透水性,使板樁墻后的水位低于墻前水位,產生向內的
水壓力,在墻后回填不是很高的狀態下,向內的水壓力就可能會超過墻后土壓力,最終使板樁墻向岸側位移。本文所引用的實例就發生了板樁墻向岸側位移的現象。通過應用 PLAXIS 對實例工程的數值模擬分析,計算結果與實測板樁墻位移趨勢一致。
1 工程實例
1.1 工程概況
本文引用實例工程為新加坡某新建船廠項目,工程包括4個新建船塢和沿岸順岸碼頭及突堤碼頭,工程平面布置見圖 1。由于船塢施工的需要,需對施工區城進行大面積開挖,開挖深度約14-16. 5m,開挖面標高-9.5~-12.1m,分2個基坑開挖。1#順岸碼頭和 2#順岸碼頭分別位于2個基坑兩側。并且順岸碼頭前沿距基坑開挖頂邊線均約 57m。